Description
Adhesives & Primer Item:Primer (use after sanding and before application of 405 adhesive) She was a former teacher She was a former teacher at SoFA Design Institute and is currently teaching at the College of Saint Benilde and holding workshops at various studios such as Soulflower and Maartsy Lead time is 7 to 14 working days once production resumes