Description
Imtra SM9025 SidePower Bow Tunnel GRP 185 x 2500 x 6mm Length: 98" for Se80 100 Sh100 PMMOLD3 heavy duty extruded post is pressed heavy duty extruded post is pressed and hydra formed into the base mechanically forming them together Depth tested and rated to 100 meters